NewsUpdates
Update No. 12: February 2022 - Phase 3 (Design and Environmental Evaluation) Commences
By: Shannon Access Posted on: 21-Feb-2022
Phase 2 (Options Selection) concluded in January 2022 following Public Display of the Preferred Option which took place between 22nd November 2021 and 6th December 2021. Following this Public Display the Option Selection Report was finalised which presents the outcome of the option selection process and identifies the Preferred Option to be taken forward to the next stages of the scheme development. Details of the preferred option are available here.
Update No. 11: (Public Display of Preferred Option - Now Closed)
By: Shannon Access Posted on: 06-Dec-2021
Update No. 10: 22 November 2021 - Public Display of the Preferred Option
By: Shannon Access Posted on: 22-Nov-2021
Public Display of the Preferred Option is now live until 6th December 2021.
Update No. 9: 16 November 2021 - Upcoming Public Display of the Preferred Option
By: Shannon Access Posted on: 16-Nov-2021
Public Display of the Preferred Option will commence on 22nd November 2021 at 3pm.
Update No. 8: June 2021 – Phase 2 Option Selection Progress
By: Shannon Access Posted on: 18-Jun-2021
Update No. 7: Appropriate Assessment (AA) for Screening for Ground Investigations
By: Shannon Access Posted on: 01-Apr-2021
Clare County Council has carried out an Appropriate Assessment (AA) Screening Report and has determined that a full Appropriate Assessment is not required in respect of the proposed N19 Shannon Airport Access Road Improvement Scheme Ground Investigations. A copy of the Appropriate Assessment (AA) Screening Report is available for download here.
Update No. 6: (March 2021) – Phase 2 Options Selection Progress
By: Shannon Access Posted on: 04-Mar-2021
Introduction
Clare County Council, in partnership with Transport Infrastructure Ireland (TII), is developing the planning and design for the N19 Shannon Airport Access Road Improvement Scheme.
Update No. 5 (Public Consultation No.1 - Now Closed)
By: Shannon Access Posted on: 03-Dec-2020
Public Consultation No. 1 – ‘Constraints & Preliminary Route Options’ ran from 12 November 2020 to 02 December 2020 and is now closed.
Update No. 4 (Public Consultation No. 1 – November 2020) – Constraints & Preliminary Route Options
By: Shannon Access Posted on: 12-Nov-2020
Public Consultation No. 1 – Constraints & Preliminary Route Options, is now live. Please click here to view the consultation information.
Update No. 3 (October-November 2020) - Phase 2 Options Selection Progress Update
By: Shannon Access Posted on: 10-Nov-2020
Introduction
Phase Two (Options Selection) of the N19 Shannon Airport Access Road Improvement Scheme is currently ongoing. A Constraints Study area has been identified for the scheme and a study has been completed to identify the nature and extent of natural and artificial constraints.